This project was planned by the firm of Carruthers & Associates Architects P.A. On March 12, 2002, the Board appointed the construction management firm of S.L. Construction & Remodeling, Inc. The scope of work included the addition of eight primary, one kindergarten, one art, and one music classroom, and a physical education office, each with associated support spaces. It also included an exterior canopy connecting the addition to adjacent buildings, enclosure of the dumpster, signage, a storm water management system, landscape and irrigation of the area between Building 1 and the addition, and a new playcourt, bus drop-off/pick-up area, and staff parking lot. First floor restrooms were remodeled and classroom restrooms were renovated. Interior walls and ceilings affected by selective demolition were painted. Interior electrical power, lighting panels, lighting system, marker boards, tack boards, HVAC systems, and acoustical ceilings were replaced, and new data, fire alarm, telephone, intercom, and security systems were provided.
This change order provides for window modifications, repairs to flooring, walls, stucco, and HVAC, and plumbing for new water coolers.
The architect advises that the referenced project is finally complete in accordance with the plans and specifications and other contract documents and recommends Board acceptance.
ANNUAL DISTRICT GOAL(S) AND CRITICAL SUCCESS FACTOR(S)
Critical Success Factor 6.a.8 - Provide sufficient student stations to ensure uninterrupted student learning and data gathering as measured by District Operational Goals plan.
FINANCIAL IMPACT (Budgeted: Yes)
This item is included in the District Capital Outlay: Community Investment Tax.
Contract Status: (See Attachment)
Revised Guaranteed Maximum Price: $2,357,249.66
EVALUATION
SUBMITTED BY:
J. Thomas Blackwell
General Manager of Construction (813) 272-4112 |
Cathy L. Valdes
Chief Facilities Officer (813) 272-4004 |
6.13 | |
Hillsborough County Public Schools (Florida) * Mtg.#20050906_151 * Section E Item# 6.13 |