Approve the Schematic Design and Design Development Phases for Heating, Ventilating, and Air Conditioning (HVAC) Renovation at Lockhart Elementary School |
|
EXECUTIVE SUMMARY | |
On October 5, 2010, the Board appointed VoltAir Consulting Engineers, LLC to provide design services. The scope of work provides for renovation of the existing HVAC system and associated controls; new fire sprinkler, fire alarm, intercom, and security systems; new ceilings and energy efficient lighting; replacement of the emergency generator; and correction of related life safety deficiencies. Project completion is scheduled for August 5, 2011. |
|
STRATEGIC OBJECTIVES | |
• Construct and maintain facilities that create an environment conducive to teaching and learning | |
FINANCIAL IMPACT (Budgeted: Yes) | |
The project is currently funded at $2,941,606. The estimate of probable cost is $2,941,000. This item is included in the District Capital Outlay: Local Millage. |
|
EVALUATION | |
SUBMITTED BY: Jill Edwards, Project Coordinator |
Rory Salimbene | Cathy L. Valdes | |
General Manager of Construction (813) 272-4112 |
Chief Facilities Officer (813) 272-4004 |
|
A 6.05b | ||