Approve Acceptance of Project for Water Intrusion Correction at Oak Park Elementary School | |
EXECUTIVE SUMMARY | |
Water intrusion at Oak Park Elementary School required remediation and implementation of corrective action to prevent further intrusion. District staff selected C.B. Goldsmith and Associates, Inc., and Gilbane Building Company from the approved Continuing Services Consultants list to provide design and construction management services for a project to accomplish the needed repairs and remediation. The project scope provided for removal and replacement of delaminated stucco and all sealants; exterior painting and limited interior painting; new walkway coatings; new drip flashings at window and door heads and new metal hoods over exterior wall louvers; and corrections to window flashing. |
|
STRATEGIC OBJECTIVES | |
• Construct and maintain facilities that create an environment conducive to teaching and learning | |
FINANCIAL IMPACT (Budgeted: Yes) | |
This item was included in the District Capital Outlay: Local Millage. Contract Status: Guaranteed Maximum Price: $899,874.00 Approved Change Orders: $143,872.15 Credit (See attachment) Revised Guaranteed Maximum Price: $756,001.85 Payments to Date: $683,412.20 Balance Due: $72,589.65 Revised Construction Cost: $801,117.79 Required Substantial Completion Date: July 19, 2013 Approved Time Extension: 28 Calendar Days Revised Required Substantial Completion Date: August 16, 2013 Substantial Completion Date: August 16, 2013 |
|
EVALUATION | |
SUBMITTED BY: Alice Sutton, Project Coordinator |
Rory A. Salimbene | Christopher Farkas | |
General Manager of Construction (813) 272-4112 |
Chief Facilities Officer (813) 272-4004 |
|
A 7.09b | ||