This project was planned by the architectural firm of Atelier AEC, Inc. On January 16, 2007, the Board appointed the construction management firm of Walbridge Aldinger Co. The renovation of existing facilities provided for new finishes throughout the facility; restoration of wood flooring; replacement of lighting, interior stairs, and heating, ventilating, and air conditioning (HVAC) system; upgrades to intercom, data, and security systems; and improvements to toilet facilities to provide Americans with Disabilities (ADA) accessibility. Exterior work includes cleaning, repointing, and sealing of all brick work; a new cafeteria patio cover; and roof replacement for the classroom building, cafeteria and second story walkways.
The architect advises that the referenced project is finally complete in accordance with the plans and specifications and other contract documents and recommends Board acceptance.
ANNUAL DISTRICT GOAL(S) AND CRITICAL SUCCESS FACTOR(S)
FINANCIAL IMPACT (Budgeted: Yes)
EVALUATION
SUBMITTED BY: John Williams, Project Coordinator
Rory Salimbene
General Manager of Construction (813) 272-4112 |
Cathy L. Valdes
Chief Facilities Officer (813) 272-4004 |
A 6.04c | |
Hillsborough County Public Schools (Florida) * Mtg.#20100727_416 * Section A Item# 6.04c |