DATE: | Tuesday, July 31, 2012 |
TO: | School Board Members |
FROM: | MaryEllen Elia, Superintendent |
SUBJECT / RECOMMENDATIONS | |
Approve Acceptance of Project for Heating, Ventilating, and Air Conditioning (HVAC) Renovation at Erwin Technical Center |
|
EXECUTIVE SUMMARY | |
A previously approved District Five Year Plan provided for renovation of the HVAC system at Erwin Technical Center. Carastro & Associates, Inc. and Vogel Bros. Building Co. were appointed to provide design and construction management services. The scope of work provided for the replacement of the existing cooling and heating plant with a new plant incorporating air cooled chillers and thermal ice storage tanks. The project also provided for the upgrade of energy management controls; replacement of air-handlers, ductwork, lights, and ceilings; campus-wide power upgrades to support the new equipment; and correction of minor code deficiencies. The engineer advises that the referenced project is finally complete in accordance with the plans and specifications and other contract documents and recommends Board acceptance. |
|
STRATEGIC OBJECTIVES | |
• Construct and maintain facilities that create an environment conducive to teaching and learning | |
FINANCIAL IMPACT (Budgeted: Yes) | |
This item was included in the District Capital Outlay: Public Education Capital Outlay (PECO) Construction ($1,960,838) and Local Millage ($4,411,818). Contract Status: |
|
EVALUATION | |
SUBMITTED BY: Jill Edwards, Project Coordinator |
Rory Salimbene | Cathy L. Valdes | |
General Manager, Planning & Construction (813) 272-4112 |
Chief Facilities Officer (813) 272-4004 |
|
A 6.07 | ||
Hillsborough County Public Schools (Florida) * Mtg.#20120731_510 (Board Meeting) * Section A Item# 6.07 |